Tag Archives: BPMN

BPMN/BPEL posts

Why BPEL is not the holy grail for BPM [P. Vigneras, Oct 21, 2008] BPMN-BPEL in Perspective: [B. Silver, Oct 25, 2008] Directly Executing BPMN [K. Swenson, Oct 29, 2008]

Posted in Etc, Workflow & BPM | Tagged , , | Leave a comment

BPMN usage and tips

Are Floating Intermediate Events Valid? The issue is an intermediate event (e.g., message or timer) “floating” in a process or expanded subprocess alongside the regular flow, the one bounded by start and end events.  The floating event has a sequence flow … Continue reading

Posted in BPMN | Tagged | Leave a comment

Arbitrary loops (GOTO activities) in sequential workflows

The following BPMN diagram presents a situation where there is an arbitrary loop with two entry points (one before Task A and one before Task B) and one exit point (after Task C). In situations like that it is not … Continue reading

Posted in BPMN, Workflow Foundation | Tagged , | 4 Comments